Skip to content
New: the free AppMetis browser extension puts measured installs and chart places on every Google Play and App Store page →
AppMetis
Google PlayFreeContains ads

Earned Value Management

Intelitech Education 🇮🇳 India

An useful guide on Earned Value Management

Installs
743
Measured
Rating
—
Ratings
—
Version
Varies with device
Updated 24 Nov 2021
Released
20 Aug 2017
Tracked since 13 May 2026
Size
6 MB
Needs 4.0.3

Also on App Store: Earned Value Management (3 ratings), Earned Value Management

Screenshots

Earned Value Management screenshot 1Earned Value Management screenshot 2Earned Value Management screenshot 3Earned Value Management screenshot 4

About Earned Value Management

The description on the store listing

✴ Earned Value Management (EVM) helps project managers to measure project performance. It is a systematic project management process used to find variances in projects based on the comparison of worked performed and work planned. EVM is used on the cost and schedule control and can be very useful in project forecasting.✴ ► Earned Value. To report the accomplishments of the project, you must apply Earned Value (EV) to the figures and calculations in the project. Earned Value is also called Budgeted Cost of Work Performed (BCWP). Planned Value (PV) is determined by the cost and schedule baseline. ✦ 【Topics Covered in this App are Listed Below】 ⇢ Earned Value Management (EVM) …

Read the full description

✴ Earned Value Management (EVM) helps project managers to measure project performance. It is a systematic project management process used to find variances in projects based on the comparison of worked performed and work planned. EVM is used on the cost and schedule control and can be very useful in project forecasting.✴ ► Earned Value. To report the accomplishments of the project, you must apply Earned Value (EV) to the figures and calculations in the project. Earned Value is also called Budgeted Cost of Work Performed (BCWP). Planned Value (PV) is determined by the cost and schedule baseline. ✦ 【Topics Covered in this App are Listed Below】 ⇢ Earned Value Management (EVM) Background ⇢ Overview ⇢ Basic Elements ⇢ Cost Variance ⇢ Schedule Variance ⇢ Miscellaneous Formula ⇢ Examples ⇢ The three key metrics

Installs since 16 Nov 2026 Measured

Exact Google Play install counts, collected daily

Updated 4 d ago

Daily history starts once this app is in our daily install sample.

Full history, growth rates and exports are in AppMetis.Start free

Ratings

  • 5 ★0.0%
  • 4 ★0.0%
  • 3 ★0.0%
  • 2 ★0.0%
  • 1 ★0.0%

Recent reviews

Latest public reviews from the store

No reviews in our sample for this app yet.

Top chart positions

Latest Google Play chart ranks by country, last 10 days

Not in any tracked top chart in the last 10 days.

Earned Value Management history

Release, install milestones, listing and store changes

Latest version 1.1 on 13 Oct 2018
  1. Reached 500+ installs 24 Nov 2021
  2. Reached 100+ installs 26 Apr 2018
  3. Reached 50+ installs 15 Jan 2018
  4. Reached 10+ installs 17 Sep 2017
  5. Reached 5+ installs 8 Sep 2017
  6. Reached 1+ installs 1 Sep 2017
  7. First released on the store 20 Aug 2017

Recent versions

Current version Varies with device

  1. Version 1.113 Oct 2018

Listing keywords

Words and phrases Earned Value Management repeats most in its store listing

value8earned7project6management5cost4evm3schedule3performed2planned2useful2variance2work2

Top phrases: earned value (7), earned value management (4), value management (4), cost and schedule (2), value management evm (2).

Highlighted words also appear in the title. Counts cover the title, short description and description.

Business model and tech

From the store listing, the SDKs in the app package and its declared permissions

Business model
Free to downloadShows ads
Built with
No cross-platform framework or game engine detected
Ad networks (1)
AdMob
Analytics and crash reports
FirebaseGoogle Analytics
Sensitive access
No sensitive permission declared

3 ad, attribution and analytics SDKs detected. SDKs are read from the app package and permissions from the store listing, so code that loads later is not seen.

Technology

7 SDKs found in the app package

Ad networks

Advertising and install-attribution SDKs found in the app package

  • AdMob

4 permissions

0 special access, 0 sensitive, 4 standard

  • Keep the phone awakeStandard
  • Full internet accessStandard
  • See network connectionsStandard
  • Receive push messagesStandard

Compliance

What the listing and the app package show

Store status
Live
Upkeep
No update since 24 Nov 2021
Registered in
India
Privacy policy
Linked on the listing
Advertising
Shows ads
In-app purchases
None declared
Age rating
Everyone
Sensitive permissions
0 sensitive of 4
Location access
No
Camera and microphone
Neither

Apps like Earned Value Management

Earned Value Management: questions and answers

How many downloads does Earned Value Management have?

Earned Value Management has 743 installs on Google Play, measured from the store's own count on 16 Nov 2026.

Who makes Earned Value Management?

Earned Value Management is published by Intelitech, a developer based in IN.

When was Earned Value Management last updated?

The latest version (Varies with device) was released on 24 Nov 2021.

Is Earned Value Management free?

Yes. Earned Value Management is free to download, and it shows ads.

Is Earned Value Management still available?

Yes. Earned Value Management is live on Google Play as of 16 Nov 2026.

Track Earned Value Management and its competitors

Watch any app for new versions, rating drops, chart moves and removals. Free plan, no card.